A developer's implementation of a greedy algorithm for a scheduling problem always returns suboptimal solutions.What could be the issue? - Study24x7
Social learning Network

Warning: include(./views/auth.php): failed to open stream: Permission denied in /var/www/html/live/loginRightSlider.php on line 18

Warning: include(): Failed opening './views/auth.php' for inclusion (include_path='.:/usr/share/php') in /var/www/html/live/loginRightSlider.php on line 18

Warning: count(): Parameter must be an array or an object that implements Countable in /var/www/html/live/makepost.php on line 52
2 followers study24x7 06 Sep 2024 10:59 AM study24x7 study24x7

A developer's implementation of a greedy algorithm for a scheduling problem always returns suboptimal solutions.
See more

A

The algorithm does not consider all possible subsets of tasks

B

The algorithm makes irreversible decisions based on local optima without considering the entire problem

C

The tasks are not sorted correctly before the algorithm is applied

D

The algorithm incorrectly calculates the finish times of tasks

study24x7
Write a comment
Most Related Articles