56 men can complete a piece of work in 24 days. In how many days can 42 men complete the same piece of work?

A

18

B

32

C

98

D

48

study24x7
Write a comment
  • Priya Sharma

  • 56 men can complete 1 work in 24 days.

    1 man complete the work in 24×56days

    42 men will do the same work in = 24×56/42 = 32 days

    SO,THE CORRECT ANSWER IS OPTION-B.