A pile of length L carrying a uniformly distributed load W per meter length is suspended at two points, the maximum B.M. at the center of the pile or at the points of suspension is - Study24x7
Social learning Network

Warning: include(./views/auth.php): failed to open stream: Permission denied in /var/www/html/live/loginRightSlider.php on line 18

Warning: include(): Failed opening './views/auth.php' for inclusion (include_path='.:/usr/share/php') in /var/www/html/live/loginRightSlider.php on line 18
26 Jun 2019 10:13 AM study24x7 study24x7

A pile of length L carrying a uniformly distributed load W per meter length is suspended at two points, the maximum B.M. at the center of the pile or at the points of suspension is

A

WL/8

B

WL2/24

C

WL2/26

D

WL2/47

study24x7
Write a comment

Warning: count(): Parameter must be an array or an object that implements Countable in /var/www/html/live/makepost.php on line 893
Most Related Articles

    Warning: count(): Parameter must be an array or an object that implements Countable in /var/www/html/live/makepostRltdArtcl.php on line 8