When a dam is to be built, a diversion tunnel is usually bored through solid rock next to the dam site to byPAss the dam construction site. The dam is built while the river flows through the diversion tunnel. - Study24x7
Social learning Network

Warning: include(./views/auth.php): failed to open stream: Permission denied in /var/www/html/live/loginRightSlider.php on line 18

Warning: include(): Failed opening './views/auth.php' for inclusion (include_path='.:/usr/share/php') in /var/www/html/live/loginRightSlider.php on line 18
01 Jan 1970 05:30 AM study24x7 study24x7

When a dam is to be built, a diversion tunnel is usually bored through solid rock next to the dam site to byPAss the dam construction site. The dam is built while the river flows through the diversion tunnel.

study24x7
Write a comment

Warning: count(): Parameter must be an array or an object that implements Countable in /var/www/html/live/makepost.php on line 893
Most Related Articles

    Warning: count(): Parameter must be an array or an object that implements Countable in /var/www/html/live/makepostRltdArtcl.php on line 8